0:00 Pre-filling hydraulic hoses
1:36 Adjusting supply pressure
2:56 Checking the fluid level
5:00 Topping up the fluid level
7:45 Assembling and fitting the lever arm
10:55 Connecting the directional valve to cylinder 1
13:23 Adding the flow meter to the circuit
15:19 Adding mass to the lever arm
18:46 Preparation for storage